Categorized | Letters, Local

Open Letter to Honourable C. Kirnon,

We are presently gearing up for the 50th Anniversary of Festival, and are hoping for many of our Diaspora Montserratians and Friends to return home to Montserrat.

Honourable Kirnon, may I humbly ask, if it is not too hard, to fix the massive pot holes going up to the Jackboy Hill and the New Windward Dump Site, as this is the Hurricane season, and before this road is totally washed out and un-driveable?

A simple plan, would entail the following vehicles and procedure:
The water tanker truck; a pickup truck with some safety cones; three public works road crew men and a ready mix concrete truck.

Methodology:-
The water truck drive ahead of the ready mix truck and wash out the pot holes, followed behind with the pickup with safety cones to put into each washed out hole, then following close behind is the Ready Mix truck and three men to fill these pot holes with concrete, and level them out, I am estimating this complete job could be completed within two or three days, four days maximum!

If we are to wait for the ready mix plant and do a total repair of that road it will be another few years, in the mean time PLEASE KEEP THAT ROAD NAVIGATABLE, another VERY IMPORTANT FACT, is if the Garbage trucks cannot drive this terrible road, we will have tons of garbage pilling up in our neighbourhoods, and this would be the very last thing we would want at xmas time or anytime!

I look forward to your SPEEDY RESPONSE TO THIS CRITICAL SITUATION, BEFORE IT IS TOO LATE!

I thank you in advance.

Capt. John

 

Leave a Reply

Grand Opening - M&D's Green Market

Newsletter

Archives

https://indd.adobe.com/embed/2b4deb22-cf03-4509-9bbd-938c7e8ecc7d

A Moment with the Registrar of Lands

We are presently gearing up for the 50th Anniversary of Festival, and are hoping for many of our Diaspora Montserratians and Friends to return home to Montserrat.

Honourable Kirnon, may I humbly ask, if it is not too hard, to fix the massive pot holes going up to the Jackboy Hill and the New Windward Dump Site, as this is the Hurricane season, and before this road is totally washed out and un-driveable?

A simple plan, would entail the following vehicles and procedure:
The water tanker truck; a pickup truck with some safety cones; three public works road crew men and a ready mix concrete truck.

Insert Ads Here

Methodology:-
The water truck drive ahead of the ready mix truck and wash out the pot holes, followed behind with the pickup with safety cones to put into each washed out hole, then following close behind is the Ready Mix truck and three men to fill these pot holes with concrete, and level them out, I am estimating this complete job could be completed within two or three days, four days maximum!

If we are to wait for the ready mix plant and do a total repair of that road it will be another few years, in the mean time PLEASE KEEP THAT ROAD NAVIGATABLE, another VERY IMPORTANT FACT, is if the Garbage trucks cannot drive this terrible road, we will have tons of garbage pilling up in our neighbourhoods, and this would be the very last thing we would want at xmas time or anytime!

I look forward to your SPEEDY RESPONSE TO THIS CRITICAL SITUATION, BEFORE IT IS TOO LATE!

I thank you in advance.

Capt. John